Stormwater Plan Review Section
|
The Stormwater Plan Review Section of the Department of Planning and Development is responsible for the review, permitting, and approval of all stormwater facilities for developer-installed projects. The Stormwater Plan Review Section's mission is to promote and protect the health, safety, and welfare of the public, by providing plan review services to prevent flooding, provide adequate drainage, and protect and enhance water quality in streams and lakes in Gwinnett County.
|
|
Contact Information
|
Gwinnett County Department of Planning and Development Stormwater Plan Review Section One Justice Square 446 West Crogan Street, Suite 150 Lawrenceville, Georgia 30046 678.518.6000 (office) 678.518.6240 (fax) Hours of Operation: 8:00-5:00 Monday through Friday Stormwater Plan Review Project Submittal Form (PDF)
|
|
Section Staff Contact Information
|
|
|
Open Records Requests
|
|
The Open Records Request Form may be used to request access to documents maintained by the department to inspect or obtain copies under the Georgia Open Records Act. This form is not required to request routinely available records such as agendas, minutes, plats, ordinances, and resolutions. Although Open Records Requests are not required to be submitted in writing, use of this form will aid considerably in ensuring that each request is fulfilled as accurately as possible. Please return the completed form to: Gwinnett County Department of Planning and Development One Justice Square 446 West Crogan Street Lawrenceville, GA 30046 678-518-6000 You can also fax or email the completed form to 678.518.6240 or pnd@gwinnettcounty.com. Open Records Request Form (PDF)
|
|
Flood Information
|
|
The Gwinnett County Department of Water Resources provides information concerning flood hazards and safety, floodplain maps and links to other State and Federal agencies that provide flood information. If you have any questions concerning this information, please call the Department of Water Resources Stormwater Management Division at 678.376.7126. Department of Water Resources Flood Information
|
|
Procedural Changes in FEMA Elevation Certificate Requirements
|
As of July 1, 2008, the following procedural changes will be implemented when obtaining a building permit requiring a Federal Emergency Management Agency (FEMA) elevation certificate: - Two (2) elevation certificates will be required. (FPMO 1.5.4)
- As-built: No changes in current procedural standards.
- Final: Prior to obtaining a Certificate of Occupancy, a "final" elevation certificate must be approved by Storm Water Management after completion of construction including final grading of the site.
All elevation certificates must be completed according to current FEMA guidelines. It is critical to use the same elevation datum used in determining the BFE (horizontal datum: NAD 1983, vertical datum: NAVD 88). No blank lines will be accepted in Section C of the elevation certificate (if not applicable, write N/A on the line). All photographs must be in color (no photo copies), 3" x 3" minimum, and attached to the appropriate sheet(s) provided with the elevation certificate. Digital prints are acceptable. Both elevation certificates will require original signatures in blue or black ink. Please reference the following FEMA web site to download the latest elevation certificate and to obtain completion instructions. FEMA Forms Thank you for your cooperation. Post Construction Elevation Certificate Requirements (PDF)
|
|